A Better Way To Build.
A Better Way
To Build.
Design for speed. Build for certainty.

Design for speed.
Build for certainty.

From proposal to install, every step is planned to reduce delay.

(514) 268-5477

Copied to clipboard

contact@f3group.ca

The F3 Process

1

2

3

PHASE 1

PRE-CONSTRUCTION

Quick. Clear. Locked-In.

We resolve the key variables early, so your project starts with clear scope, pricing, and drawings.

PHASE 2

FACTORY BUILD

Built in Parallel

While the structure goes up, walls and panels are manufactured in a controlled environment.

PHASE 3

RAPID INSTALL

The Speed Zone

Panels install fast. Floors follow. Interior trades start sooner.

90-Minute F3 Proposal + Price

Architecture Review

Defined Scope

Contract + 20% Deposit

Virtual Mock-up +
Full Shop Drawings*

Complete Engineering Package

90-Minute F3 Proposal + Price

Architecture Review

Defined Scope

Contract + 20% Deposit

Virtual Mock-up +
Full Shop Drawings*

Complete Engineering Package

90-Day Factory Mobilization

Envelope and/or superstructure being manufactured in parallel with concrete work

Quality controlled environment

No weather delays

90-Day Factory Mobilization

Envelope and/or superstructure being manufactured in parallel with concrete work

Quality controlled environment

No weather delays

2 Weeks: Walls and/or Exterior Panel*

2 Weeks: Floor + Concrete *(if CFS load-bearing superstructure)

Interior trades start immediately

2 Weeks: Walls and/or Exterior Panel*

2 Weeks: Floor + Concrete *(if CFS load-bearing superstructure)

Interior trades start immediately

90-Minute F3 Proposal + Price

Architecture Review

Defined Scope

Virtual Mock-up + Full Shop Drawings

Complete Engineering Package

90-Day Factory Mobilization

Envelope and/or superstructure being manufactured in parallel with concrete work

Quality controlled environment

No weather delays

2 Weeks: Walls and/or Exterior Panel**

2 Weeks: Floor + Concrete (if CFS load-bearing superstructure)

Interior trades start immediately

1

2

3

30-Day
Cycle

Walls + Panels

2 Weeks

Floors + Concrete

2 Weeks

Next Floor

Repeat

Interior Trades

Start Sooner

Walls + Panels

2 Weeks

30-Day
Cycle

Floors + Concrete

2 Weeks

Next Floor

Repeat

Interior Trades

Start Sooner

4

PHASE 4

REPEATING 30-DAY CYCLE

Once the first floor is complete, the cycle repeats floor by floor.

THE RESULT

30-40% Faster
Critical Path

30-40% Faster
Critical Path

Waterproof your building in under a year.

Waterproof your building in under a year.

Interior trades
start weeks earlier

Reduced exposure
to delays

More predictable
scheduling

Faster path
to occupancy

Interior trades
start weeks earlier

Reduced exposure
to delays

More predictable
scheduling

Faster path
to occupancy

Faster timelines. Lower costs. Better returns.

Faster timelines. Lower costs.
Better returns.

  • VERTICALLY INTEGRATED

  • LOAD-BEARING CFS WALLS & FLOORS

  • PREFAB FINISHED PANELS

  • INTERIOR FRAMING & FINISHES

  • MINIMAL WASTE

  • NO MULTI-YEAR SUPERSTRUCTURE & CLADDING SCHEDULES

  • LEAN PROCESSES

  • CROSS-TRAINED TEAMS

  • SPEED

Get a 90-Minute Proposal + Price

Get a
90-Minute
Proposal + Price

Clear scope, real numbers, and a faster path forward.
Before you commit.

(514) 268-5477

Copied to clipboard

contact@f3group.ca

Built around your project.

© 2026 F3 Group Inc. or its affiliates. All rights reserved.

© 2026 F3 Group Inc. or its affiliates. All rights reserved.

© 2026 F3 Group Inc. or its affiliates. All rights reserved.

© 2026 F3 Group Inc. or its affiliates. All rights reserved.

© 2026 F3 Group Inc. or its affiliates. All rights reserved.

The F3 Process

Our Story

Careers

Support

Framing + Finishes

Facades

Build Smarter. Faster.

START TOGETHER